Gia Tan water plant - Dong Nai
FLOW CONTROL
Water supply for the five Kiem Tan communes and the Dau Giay urban area, phase 1, 20,000 m³/day, Thong Nhat district, Dong Nai. Owner: Gia Tan Water Supply JSC (GIWACO); main contractor: Water Supply and Drainage Investment and Construction JSC (WASECO).
CAD supplied the valve package (manual and control valves) for the raw-water pump station and the treatment area (settling tanks and gravity rapid filters).
