Toàn cảnh Nhà máy Đạm Cà Mau FIRE & GAS SAFETY

Client: Ca Mau Fertilizer Plant (PVFCCo), Ca Mau. CAD carried out two scopes at the plant.

Gas safety and combustion systems: upgrade of the gas safety system and the combustion system.

Industrial valve package: for the plant's melted-urea complex fertiliser project (300,000 tonnes a year; owner PVFCCo – Ca Mau Fertilizer, main contractor Chemical Industry Design JSC), CAD supplied CWT (Canada), SAMSON (Germany) and AZ Armaturen (Germany) valves: control valves, manual valves and plug valves. The photos show the valve lot delivered to site and AZ plug valves as unpacked.