Wastewater Treatment Plant - Nhon Trach 2 Industrial Park
FLOW CONTROL
Centralised wastewater treatment plant of Nhon Trach II Industrial Park, phase 2, Dong Nai, 5,000 m³ of wastewater a day. Owner: Nhon Trach II Industrial Park Management Board; main contractor: SEEN Technical JSC.
CAD supplied the valve package (mechanical and control valves) for these works: receiving chamber; screens and grit removal; oxidation ditch; secondary clarifier and disinfection tank; stabilisation pond and flow-measuring channel; sludge pump station and sludge thickener.
